Maintenance procedures
1. The crusher is not allowed to start with load.
2. When crushing ore, the ore must be given to 2/3 of the crushing cavity.
3. The inspection, cleaning and repair of the spindle shall not be less than once a year, and the ammeter shall be inspected once every six months.
4. Check the spring bolts and back wheel bolts frequently, and tighten them in time if they are loose, without delay.
5. Keep the motor, main engine, and pipe clean and free of oil and water leakag
Contact us for more info if you have any inquires or questions.email: mfsales@qrcrusher.com
Post time: Jun-21-2021