Material: Mn13Cr2( M1 equivalent grades), Mn18Cr2(M2 equivalent grades), etc.
Casting Manufacturing Process:
1、Pouring the molten iron water into the pattems
2、The know-how H.t(the temperature and time are controlled)heat treatment
3、To Maching the casting High Chrome or high manganese according to the drawing.
4、Water quenching Treatment
5、Grinding the surface
6、Quality inspection (Dimensional inspection, hardness inspection, mettallographic structure, etc)
7、Finish products with no painting
8、Finish products with painting in container
Lead time:25-35days.
Application: Cement firms, coal fired power plant ,mining firms ,metallurgy ,quarry firms
Quality First, Safety Guaranteed